PM Surya Ghar subsidy up to ₹78,000 Empanelled with DHBVN & UHBVN Easy EMI from ₹1,500/month — calculate → 25–30 year panel warranty 5 years free service Grow with us — Become a partner →
PM Surya Ghar Muft Bijli Yojana
Home PM Surya Ghar

PM Surya Ghar Muft Bijli Yojana

Get up to ₹78,000 central subsidy on rooftop solar for your home — credited straight to your bank account. We take care of the complete process.

Quick answer

How much subsidy for 3 kW solar in Haryana?

₹78,000 — the maximum central subsidy. 1 kW gets ₹30,000, 2 kW gets ₹60,000, 3 kW and above ₹78,000, paid straight to your bank account.

Quick answer

Solar panel price in Jind (3 kW)?

About ₹1,80,000 for a 3 kW on-grid system (indicative, GST included) — only ₹1,02,000 after the ₹78,000 subsidy.

Quick answer

How do I apply for PM Surya Ghar?

Register on the PM Surya Ghar portal, get DISCOM feasibility, install with an empanelled vendor, then net meter and inspection — the subsidy comes to your bank. Zento Solar does every step for you.

Subsidy amount

How much subsidy will you get?

Central Financial Assistance (CFA) depends on the size of your rooftop system.

Subsidy ka fayda lene ka samay baakiScheme closes on 31 March 2027
157DAYS
00HOURS
43MINS
34SECS
1 kW₹30,000
2 kW₹60,000
3 kW & above₹78,000
BPL families · Haryana up to ₹1,10,000 On a 2 kW system: ₹60,000 central subsidy + ₹50,000 State Financial Assistance (SFA). Family ID needed.
New rooftop solar panels under PM Surya Ghar
Direct to banksubsidy in your account
EmpanelledDHBVN · UHBVN
Right size

Which system suits your bill?

Monthly consumptionSuitable systemSubsidy
0–150 units1–2 kW₹30,000 – ₹60,000
150–300 units2–3 kW₹60,000 – ₹78,000
Above 300 units3 kW +₹78,000

Rate: ₹30,000/kW up to 2 kW, ₹18,000 for the 3rd kW, capped at ₹78,000. Eligible BPL families in Haryana can additionally get State Financial Assistance (SFA) of ₹50,000.

Who is eligible?

Check these four points
  • Indian citizen owning a house with a suitable roof
  • Valid domestic electricity connection in your name
  • Not availed any other solar subsidy for the same roof
  • System must use DCR (made-in-India) panels from an empanelled vendor
Not sure? Send us a photo of your latest electricity bill on WhatsApp — we will check it for free.
Documents

Keep these ready

Our team collects them at your doorstep and signs the vendor agreement with you.

01
Aadhaar card
02
Latest electricity bill
03
Email ID
04
Bank passbookFirst page
05
Passport-size photo
06
Family IDOnly for BPL subsidy file
07
Property papersOnly for name change / load extension
The process

From application to subsidy in your account

Six simple steps — we handle every one of them.

  1. Free site survey & quotation

    We check the roof and load, and give a written price with subsidy.

  2. Registration on PM Surya Ghar portal

    Application, consumer details and sanctioned load verification.

  3. Vendor agreement & feasibility

    Agreement uploaded; DISCOM technical feasibility approval.

  4. Installation

    Structure, DCR panels, inverter, earthing and lightning arrestor — 1–2 days.

  5. Net meter & DISCOM inspection

    Net-meter application and fees, installation, inspection and commissioning.

  6. Subsidy credited

    Bank account verification and CFA released directly to you.

Questions

Subsidy FAQs

Short answers to what families ask us most.

Still have a question?Call +91 89505 17106 or WhatsApp us.
How much subsidy will I get for 3 kW solar in Haryana?

₹78,000 — that is the maximum central subsidy (CFA) under PM Surya Ghar, and it stays the same for 3 kW or any bigger home system. A 1 kW system gets ₹30,000 and 2 kW gets ₹60,000.

What is the price of a 3 kW solar system in Jind after subsidy?

A 3 kW on-grid system costs about ₹1,80,000 (indicative, GST included). After the ₹78,000 subsidy your real cost is about ₹1,02,000. The exact price is given in writing after a free site survey. Calculate for your bill →

Who can get ₹1,10,000 subsidy?

Eligible BPL families in Haryana. On a 2 kW system they get ₹60,000 central subsidy plus ₹50,000 State Financial Assistance (SFA). The Family ID (Parivar Pehchan Patra) is needed for this file.

Where is the subsidy paid?

Directly into your own bank account, after installation, net metering and the DISCOM inspection are complete. That is why we need the first page of your bank passbook.

How long does the whole process take?

Installation takes 1–2 days once documents and approval are in place. Net meter and DISCOM inspection usually take 2–4 weeks, and the subsidy is released after that.

Which documents are needed?

Aadhaar card, latest electricity bill, email ID, bank passbook (first page) and a passport-size photo. Family ID only for the BPL subsidy file; property papers only for a name change or load extension.

Can I pay in EMI?

Yes. We help with the bank loan, so you can go solar with an easy EMI of about ₹1,500–2,000 per month instead of a big upfront payment. Check your EMI →

Is Zento Solar an approved vendor?

Yes — we are empanelled with DHBVN and UHBVN for rooftop solar, and we use DCR (made-in-India) panels as the scheme requires. We handle the portal application, net meter and subsidy for you.

Solar lagwaiye, bilkul free jaisa.

Apply for PM Surya Ghar with Zento Solar

Leave your number — our subsidy expert will check eligibility and guide you through every step, free.

Up to ₹78,000 subsidy BPL: up to ₹1,10,000 EMI ₹1,500–2,000/month

Check my subsidy

No spam. Our solar expert will call you within 24 hours.